Stormwater Cistern Drawdown Planner

Scenario arithmetic only—not engineering design, regulatory compliance, infiltration suitability, water-quality, or flood-safety advice. Verify system assumptions and requirements with qualified local professionals.

Period is YYYY-MM-DDTHH:00 for hourly or YYYY-MM-DD for daily. Each row first adds inflow and removes above-capacity overflow, then allocates controlled release, infiltration, reuse, and assumed losses. Outlet activity is limited by active hours; infiltration runs across the one- or 24-hour step. Reserve constrains release, infiltration, and reuse, but not losses.